TURIN SWIMMING POOL

Piscina Combi Torino

 

 

Turin, 2003

Project by Arata Isozaki associates, Archa spa and Ove arup Milan

(Team Isozaki: Andrea Maffei, Stefano Tozzi, Claudia Tinivella, Shinobu Hashimoto )

 

The design of the swimming-pool design is part of the development for the XX Winter Olympic Games in 2006.

The facility is located to backside of Turin Ice Hockey Stadium, Arata Isozaki associates, Archa and Arup have been commissioned  its design by Turin municipal.

It has 50 meters long swimming pool and tribune seats, which has been considered all international olympic standard regulations for the construction of a facility.

I was in charge of the development of definitive project phase and internal lighting design of the main hall.